Futura

Futura 1

Description

FUTURA is a truck ferry for Scandlines under construction at Cemre Shipyard as NB1090 for delivery in 2025. The ferry is a battery-hybrid vessel that will be operating the Puttgarten-Rødby route between Germany and Denmark. The large battery installation of 10 MWh can be charged in just 17 minutes in Rødby. With a crossing time of one hour, the ferry is emission free in operation. It can also be operated as a hybrid ferry and then the crossing time is 45 minutes.

Features

  • Zero emission
  • Safe return to port
  • Fully redundant battery system
  • Heat recovery for HVAC
  • CFD optimized hull

Capacities

  • Trucks: 66 units
  • Passengers: 140 pax

Class

LRS

Design: Scandlines PR24
Name: Futura
Delivered: 2025
Length OA: 147.4
Beam: 25.4
Scope of work: Basic Design
Ship Type: Truck Ferry
Ship Owner: Scandlines
Shipyard: Cemre Shipyard