Futura
Description
FUTURA is a truck ferry for Scandlines under construction at Cemre Shipyard as NB1090 for delivery in 2025. The ferry is a battery-hybrid vessel that will be operating the Puttgarten-Rødby route between Germany and Denmark. The large battery installation of 10 MWh can be charged in just 17 minutes in Rødby. With a crossing time of one hour, the ferry is emission free in operation. It can also be operated as a hybrid ferry and then the crossing time is 45 minutes.
Features
- Zero emission
- Safe return to port
- Fully redundant battery system
- Heat recovery for HVAC
- CFD optimized hull
Capacities
- Trucks: 66 units
- Passengers: 140 pax
Class
LRS
Design: Scandlines PR24
Name: Futura
Delivered: 2025
Length OA: 147.4
Beam: 25.4
Scope of work: Basic Design
Ship Type: Truck Ferry
Ship Owner: Scandlines
Shipyard: Cemre Shipyard
